Linwood Avenue Sidewalk Project
Project Description
The Linwood Avenue Sidewalk Project entails replacing sidewalks and filling in missing sidewalks along Linwood Avenue SW and adjacent streets to complete a walkable path between residential neighborhoods and Michael T Simmons Elementary School.
Work will include grinding and demolition of existing pavement; adjusting utilities; reconstructing sidewalks, curb ramps, and driveway approaches; and adding pedestrian crossings. Sidewalks will be expanded into bulb outs on the north side of Linwood at the corners of 5th, 6th, 7th, and G Streets to shorten the crossing distance for pedestrians.
The intersection of 2nd Avenue SW and Linwood Avenue SW is not included in the scope of this project but will be reconfigured as part of a future project when funds become available.
Project Funding
This approximately $1.5 million project received grant funding from the Washington State Transportation Improvement Board (TIB). The local match includes sales tax revenue from the Tumwater Transportation Benefit District and funds from the City’s Transportation Fund in the Capital Facilities Plan.
- $1,080,502 Local funding
- $ 371,250 TIB funding
Timeline
Construction is scheduled from August - November 2024.
Most work will take place 7:00 a.m. - 5:00 p.m. weekdays. Work that is weather dependent or depends on lighter traffic may be scheduled at night or on weekends if necessary.
Project Personnel
- Construction Manager: Colby Fletcher, City of Tumwater
- Project Inspector: Matthew Joseph, City of Tumwater
- Awarded Contractor: Northwest Cascade, Inc.
Contact Us
Call the Project Info Line at (360) 252-5408, or email us to contact a staff member.